Al Rayadah Investment Company, the investment arm of the Public Pension Agency, has awarded the contract to MASCO for Infrastructure construction works for Obhur Al-Janoubia Housing Project in Jeddah. The scope of work for MASCO consists of:Infrastructure Development of Jeddah Housing Complex in Obhur – North of Jeddah including;Earthworks, Civil works for Site Development including Road works, Sidewalks;Asphalt Pavements; Utilities including Water, Drainage & Sewage Distribution Network; Mechanical Works & services; Electrical works including Light Poles.
Irrigation works.
The Total area of the project is nearly 2.5 million m².
The project has been designed according to the latest standards and specifications, as it is located on the way to Madinah in front of the north terminal of King Abdul-Aziz International Airport
Masco's affiliated company in Power sector (Advanced Energy Company) has successfully tested, commissioned and energized, prior to Hajj 1435H, electrical substation 110/13.8kV, to the best satisfaction of the Project Client - National Grid.
The Project "ARAFAT-2" is located in the Holy City of Makkah. The scope of work for this turnkey Project comprises of Design, Engineering, Procurement, Construction, installation, Testing & Commissioning of 110/13.8kV Indoor sub-station including Civil, Electrical & Mechanical works.
The Minister of Transport Dr. Jabara bin Eid Suraiseri, that the ministry is currently implementing a network of roads and intersections to connect the city of King Abdullah Sports in Jeddah, including the establishment and development of five junctions key to both through Rapid City and through the Holy.
Among Suraiseri that the ministry is currently implementing a number of intersections, are (the intersection of sail and the intersection of Hall of pilgrims and the intersection of the north lounge) on the road to Medina, and (the intersection of King Abdullah City Sports and the intersection of Asfan) on the road Haramain, where the number of bridges covered by these intersections 14 , in addition to four bridges the valleys, and the excesses of the quantities of reinforced concrete work for these bridges and necessary complementary works (185,000 m3).
The Minister of Transport confirmed that this project and when completed, God willing, you will achieve a direct link to the city of King Abdullah Sports on the road to Medina and through the Holy entry and exit, in addition to service projects that are located north, west and south of King Abdul Aziz International Centre for Prince Sultan civilization project of the Ministry of Housing The project King Faisal Specialist Hospital and the housing project of the Foundation for retirement in addition to the direct link to the urban areas east through the Holy with a road-Haramain and through Medina, which would directly benefit in facilitating traffic to all neighborhoods Urban located north and west of King Abdul Aziz International Airport and east through the Holy and South intersection Asfan.
Digital construction is the use and application of digital tools to improve the process of delivering and operating the built environment” In general terms that will translate into making the delivery, operation and renewal of our built environment safer, more efficient and more collaborative.
Over at MASCO we use state of the art digital technology with the latest tools to achieve the best goals. As it becomes clearer and clearer that digitalization is the future, we want to stay ahead of the wave, staying ahead of our competition.
Using such technologies helps us find solutions more efficiently and adequately, which makes our process faster and more fail proof.
We aim to further improve our digital construction methodologies and tools to keep on developing with the ever-evolving digital age of the 21st century.
Saudi ARAMCO awarded the contract to Mohammed A. Al Swailem Co. (MASCO) for the Design, Engineering, Installation of Pipeline Leak Detection System (LDS) and Corrosion Monitoring System (CMS), at the Southern and Northern areas of the Eastern Province to enhance safety and performance of pipeline operations.
There are 12 different Main areas namely Shedqum, Ain Dar, Abqaiq, Hawyah, Uthmaniyah, Udaailiyah, Harad, Dhahran, Qatif, Ras Tanoura, Berri, Tanajeeb in the Eastern province and 69 sub areas to install shelters to accommodate the field site processors and modems and many electrical equipment belong to the two control systems,
The project shall provide for a high performance leak detection system which shall
be installed in the existing “above ground” sour gas pipelines & shall provide for a real-time corrosion monitoring system, which shall be installed for the existing “above ground” sour liquid service pipelines.
The construction also consists of around 100 km of trenches to install the fiber , power, and instrumentation cables.
There are very serious mechanical works to be accomplished in this Project such as the hot tapping. As per contract, 91 hot tap points need to be done on live pipelines without shutdown.
Worley Parsons is a leading provider of professional services to the resources & energy sectors and complex process industries. They are one of the largest international Design, Engineering and Consulting company approved by ARAMCO. Worley Parsons as our partners, will provide Engineering Detailed Design based on the requirements provided by Aramco